Flagship Carwash Construction Maintenance of Traffic (MOT)


September 2023
Engineering|Design

The MOT design created during my time with Bowman Consulting was a key contribution to this Flagship Carwash construction project. The project site was at the intersection of an arterial road with a major highway. Developement of the resulting three phase MOT plan involved carful analysis of the surrounding properties and roadway geometries leading up to the intersection.

What I did

  • MOT Design
  • Plan Layout

Tools I used

  • Civil 3D

View Document